GIS vs Air Insulated Substation: When the Site Decides
Ameren's Goalby substation shows the real GIS vs air insulated substation test: not whether the lot is small, but whether site cost scales with area.
Read analysisProcurement intelligence on equipment, supplier capacity, and policy. Built for electrical distribution.
Get The Feeder, our free weekly briefing.

Ameren's Goalby substation shows the real GIS vs air insulated substation test: not whether the lot is small, but whether site cost scales with area.
Read analysis
Hitachi's $528M Mississippi transformer plant is scheduled to build 10 to 160 MVA units from 2029, per a Hitachi SVP, and replaces an existing plant.
Read analysisSRP approved Marigold on Sept. 14. What the SRP Marigold Energy Center substation scope discloses, and what the ACC siting hearing does not cover.

A Colorado judge found gen-tie line eminent domain unavailable on a wind interconnection route. 550 feet of easement holds up 1,053 MW of built turbines.

DOE 2029 transformer efficiency requirements are uneven by kVA and phase. Single-phase and three-phase units take their biggest cuts in opposite ranges.

From grid fundamentals to transformers. Short lessons built for buyers, with practical checks to make the knowledge stick.
Start learning for freeSee the material before you decide. Explore a report sample or browse the member library.
Open sample PDF (opens in a new tab) A dated PDF covering lead times, supplier capacity, and demand signals for one equipment category.
Preview: Q2 2026 sample. Illustrates report structure, not the current edition. Check dates and availability in the catalog.
Premium research, dossiers, and RFQ and specification templates. A library to return to when the questions get specific.
$9.99/ month
Join InsiderThe Feeder brings equipment, supplier, and policy research to your inbox. Free, with sources you can follow.
Questions about a report edition, the Insider membership, or The Feeder? Send us a note.
[email protected]